Power System Engineering

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

IETS engineers can provide, upgrade or modify any of the power system needs you may have. We can perform protective device coordination and short circuit studies to ensure the safe, efficient, and economical operation of your electrical distribution system as well as ensuring that personnel and equipment are protected by establishing proper interrupting ratings. In addition, we can identify power factor/transients/harmonics issues that may be costing unnecessary unity power or production loss costs. Protective Device Coordination, Short Circuit and Arc Flash studies, will not only keep you in compliance with insurance providers, but will also offer the level of safety protection your employees and company deserve.

Power System Consultation
Power System Audits
Power System Studies-  Protective Device Coordination, Short Circuit/Load Flow Analysis, Power Factor Correction, Harmonics Analysis, Transient Analysis, Grounding Studies
Switching Procedure Development

 

 

 

Arc Flash Segment

Section 5(a)(1) of the Occupational Safety and Health Act, otherwise known as the general duty clause, requires an employer to furnish “employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to employees.”

As most of us in the industry are aware, arc flash has come to the forefront of every plants (including power plants in ’09) electrical safety protocol. IETS can help your company adhere to the requirements and also provide mitigation techniques that best suit your particular needs.


Bushing Redesign & Installation at Utility